Certification: | CCC, CE, FCC, ISO |
---|---|
Technique: | Chopped Strand Fiberglass Mat (CSM) |
Mat Type: | Continuous Filament Mat |
Still deciding? Get samples of US$ 1/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specifications
Product code | Area weight | Density warp × weft (ends/cm) | Tex (warp x weft) | Combustible content (%) |
EWR200 | 200 | 4.6×4.6 | 200×200 | 0.4-0.8 |
EWR270 | 270 | 4.6×4.1 | 300×300 | 0.4-0.8 |
EWR300 | 300 | 5.0×5.0/3.2×1.8 | 300×300/600×600 | 0.4-0.8 |
EWR360 | 360 | 3.2×1.8 | 600×900 | 0.4-0.8 |
EWR400 | 400 | 3.6×3.2 | 600×600 | 0.4-0.8 |
EWR500 | 500 | 2.2×2.0 | 1200×1200 | 0.4-0.8 |
EWR580 | 580 | 2.6×2.2 | 1200×1200 | 0.4-0.8 |
EWR600 | 600 | 2.6×2.4 | 1200×1200 | 0.4-0.8 |
EWR800 | 800 | 2.0×1.6 | 2400×2400 | 0.4-0.8 |
Qinhuangdao Tongyu Building Materials Co., Ltd. Is dealing in fiberglass mesh,fiberglass self adhesive tape,glass wool,rock wool and other building material and thermal insulation materials, plastic products, packaging materials.Our company has been committed to energy-saving environmental protection projects; always adhere to the "integrity and win-win" for the purpose of the enterprise, "technology and services" for the Founding of the community spirit and the formation of a complete service system.
FAQs
1. What is your terms of packing?
Generally, we pack our goods in carton with pallet
2. What is your tems of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
3. What is your terms of delivery?
EXW, FOB, CFR, CIF,L/C at sight
4. How about your delivery time?
Generally, it will take 21 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
5. Can you produce according to the samples?
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
6. What is your sample policy?
We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
7. Do you test all your good before delivery?
Yes, we have 100% test before delivery